Home | Case study | Refurbishment – Mablethorpe Environment Agency Depot

Refurbishment - DEFRA Mablethorpe

Sector

Local Authorities/Govt.

Location

East Midlands

Service

Refurbishment

We began work in November 2025 with a clear strategy to maintain full operational continuity for the Environment Agency. To achieve this, we established a dedicated site compound and set up temporary accommodation for the client’s staff. This allowed the depot team to continue their daily tasks without disruption while we completed the extensive internal strip-out and structural works.

Our team completely reconfigured the building’s interior. We stripped out and replaced all mechanical and electrical services, decommissioned a redundant joinery workshop, and extended the mezzanine level to create a spacious new meeting room with skylights for natural light. On the ground floor, we built three new washroom facilities, a commercial kitchen, a breakout space, and dedicated locker and drying rooms. We also upgraded the building’s thermal and environmental performance by installing an air source heat pump system, wall and floor insulation, new fire doors, secure external steel doors, and an automated entry gate.

What we did

We delivered a comprehensive internal refurbishment of an operational Environment Agency depot to modernise the facility and create a compliant, future-proof workspace.

Specifications

  • Air source heat pump installation
  • Mezzanine extension with skylights
  • New commercial kitchen and breakout area
  • Three ground-floor washrooms
  • Locker and drying room facilities
  • Upgraded wall and floor insulation
  • CCTV, intruder, and fire alarm systems
  • Automated entry gate and steel doors
  • New structural timber joists and chipboard flooring

Project Overview

Number of months

7

Contract Value

£

560

K

During the initial strip-out, we uncovered a significant challenge: the existing upper floor structure was non-compliant and structurally unsafe. This posed a serious risk to both safety and the project timeline. We worked closely with structural specialists McAndrew Martin Ltd to design and install a completely new floor structure. This involved removing the original timber joists and installing upgraded structural members, a tongue-and-groove chipboard floor, a fire-rated partition, and a new internal staircase.

Despite the substantial increase in the scope of work, we maintained tight control over the programme. By reorganising our resources, rescheduling tasks, and working closely with the design team, we completed the project by 24 May 2026. This required only a short extension to the original deadline, ensuring the client received a fully compliant, high-quality facility with minimal delay.

Innovations, challenges, solutions

We collaborated with structural engineers to rapidly redesign and replace a non-compliant upper floor structure discovered during early demolition.

Fieldway

Have a project to discuss

0151 480 9909
enquiries@fieldway.co.uk

Please enter your first name

Please enter your surname

Please enter a valid email address

Please add description of enquiry

Please agree to the terms*

Thank you! Your form has been successfully submitted. Someone will be in touch with you soon.

Error sending form.

You may also be interested in...

Capital Shopping Centres – Fire Protection and Structural Encapsulation

Fieldway delivered 30,000m² of passive fire protection at operational Eldon Square shopping centre in Newcastle.

Steel girders under white arch

The Mall Blackburn – Fire Protection and Insulation

Fieldway delivered passive fire protection and 4,700m² of soffit insulation at The Mall Blackburn shopping centre.

Kier Construction Ltd – Electrical Installation

Fieldway delivered phased temporary electrical installations for Kier across a 71,000 sq ft C.R. Laurence development.

Salford City Council – Fire Alarm Upgrade

Fieldway upgraded the fire alarm system at the 20-bed Barton Moss Secure Care Centre for Salford City Council.

Wythenshawe Community Housing Group – Fire Alarm Upgrade Programme

Fieldway upgraded fire alarm systems across nine 16-storey Wythenshawe Community Housing Group blocks in South Manchester.

PA Housing – Fire Safety Maintenance and Compliance Programme

Fieldway delivers a seven-year fire safety maintenance programme for PA Housing across Nottingham, Derby and Leicester.

Battersea Power Station Development Company – Fire Stopping and Acoustic Sealing

Fieldway delivered specialist passive fire and acoustic sealing works within the iconic Battersea Power Station redevelopment in London.

Jigsaw Homes Group – Fire Compartmentation and Passive Fire Remediation

Fieldway delivers passive fire remediation and compartmentation surveys for Jigsaw Homes across its national property portfolio..

Transport for Greater Manchester – Fire and Electrical Compliance

Fieldway maintains fire and electrical systems across 28 Transport for Greater Manchester sites throughout Manchester.

Fire door, brick wall, red fire extingusher

E3 Cube – Schools and Academies Fire Safety Improvement

Fieldway delivered fire safety improvements across five schools and academies in the North of England with E3 Cube.

Wirral Borough Council – Lingham Primary School Fire Alarm Upgrade

Fieldway upgraded the fire alarm system at Lingham Primary School in Moreton for Wirral Borough Council.

Your Housing Group – Major Property Electrical Inspection Programme

Fieldway completed 4,000 EICRs across Your Housing Group’s portfolio, including C1 and C2 electrical remedial works.

BAM Construction – Site Set-Up and Building Fit-Out

Fieldway provided BAM Construction with site set-up and fit-out support across two Manchester city-centre construction projects.

Cobalt Housing – Fire Safety Servicing, Maintenance and Upgrades

Fieldway delivers fire safety servicing and fire alarm upgrades across 960 Cobalt Housing properties in Liverpool.

Mosscare St Vincent’s – Fire Door FRA Remedials

Fieldway delivers fire door remedial works for Mosscare St Vincent’s following Fire Risk Assessment recommendations across the North West.

Johnnie Johnson Housing – Compartmentation and Fire Doors

Fieldway delivered compartmentation, fire door and FRA remedial works across more than 80 Johnnie Johnson Housing properties.

Housing Solutions – Fire Compartmentation and Fire Door Remediation

Fieldway delivered passive fire protection and fire door remediation across three Housing Solutions properties in Berkshire.

operative in high vis testing an electrical outlet

Together Housing – Electrical Inspection and Compliance

Fieldway completed EICRs and remedial electrical works across 985 Together Housing properties in Yorkshire and Lancashire.

Countess of Chester Hospital – Fire and Security Alarm Replacement

Fieldway is replacing fire and security alarm systems within the live healthcare environment at Countess of Chester Hospital in Chester.

operative in orange high vis vest testing newly installed alarm system

Southway Housing Trust – Fire Safety and Building Systems Maintenance

Fieldway maintains fire and building systems across 6,000 Southway Housing Trust properties throughout Manchester.